The road program oversees construction, maintenance, and
repair of 302 miles of the roads in Tompkins County.
Major road construction & design plans include:
Dubois Road - Town of Ulysses
Locke Road - Town of Lansing
McLean-Cortland Road - Town of Groton
Coddington Road - Town of Ithaca
East Hill Intersections Safety Improvement Project - Town of Ithaca
Ellis Hollow Road - Town of Ithaca
Flat Iron Road - Town of Caroline
Midline Road - Town of Dryden
Sheffield Road - Towns of Ithaca & Enfield
South Danby Road - Town of Danby
South Street Slope Stabilization - Town of Ulysses
Type: Reconstruction
Project Status: Planning
Location / Section: Between Kraft Road and Perry City Road
Schedule: Spring of 2018
Type: Resurfacing
Project Status: Planning
Location / Section: Between Route 34 and West Road
Schedule: Summer of 2018
Type: Resurfacing
Project Status: Planning
Schedule: Summer of 2018
Location / Section: Gulf Hill Road to the county line
Type: Reconstruction of the area at the intersection of Burns and East King Roads, to provide safety improvements.
Project Status: Design
Location / Section: Approach to Burns Road from the south, and East King Road from the north.
Schedule: Construction planned for 2018
Links: Aerial Map View
Design Report (2007 version)
This project will construct safety improvements at two pedestrian crossings on Pine Tree Road: at the entrance drive of East Hill Plaza and at a mid-block crossing on Ellis Hollow Road, 200' east of Pine Tree Road. Proposed improvements include the addition of pedestrian-activated traffic signals at the plaza entrance and orienting Pine Tree pedestrian trail traffic to the Ellis Hollow intersection, and eliminating the mid-block crossing.
Type: Reconstruction
Project Status: Design
Schedule:
Construction - 2018
.
Type: Reconstruction
Project Status: Design
Location / Section: Pine Tree Road to Game Farm Road
Schedule & Design: Phase 3 - Design and construction - 2018
Type: Reconstruction
Project Status: Complete
Schedule: Construction is complete
Location / Section: Route 79 to Harford Road
Type: Milling and True & Leveling
Project Status: Complete
Location / Section: Ringwood Road to Hunt Hill
Schedule: Construction is complete
Type: Asphalt Milling, Ditching, Shoulder Rebuild
Project Status: Complete
Schedule: Construction is complete
Location / Section: Bostwick Road to Hayts Road
Type: Asphalt Milling, Ditching, Shoulder Rebuild
Project Status: Complete
Schedule & Design: Construction is complete
Location / Section: From Route 96B for appoximately 2.5 miles
Type: Restoration of roadside embankment
Project Status: Design
Schedule & Design: Construction in 2018